¡¤Add: No. 1042,JiangHaiEast Road,
WuXi City JiangSu, China
¡¤Zip code: 214027
¡¤Mail: scy_808@yahoo.com.cn
Application process
1¡¢
ABS material-all kinds color, 2-component fast-drying primer Proportion-primer: cruing agent: special thinner= 3£º1£º3-4 Drying temperature and drying time: under 0¡æ: 10-15 minutes stoving; Above 0¡æ: no need of stoving.
ABS-elastic varnish: proportion-elastic varnish: cruing agent: Thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 60-65¡æ, 60-80 minute.
2¡¢
Reinforced nylon material- all kinds of colors, 2-component fast-drying primer Proportion- primer:cruing agent: special thinner=3£º1£º3-4 Drying temperature and drying time: 90-100¡æ, 40-60 minute.
Reinforced nylon- elastic coatings Proportion-elastic varnish: cruing agent: special thinner=10£º1£º3 Or 10£º1 Drying temperature and drying time: 90-100¡æ, 40-60 minute.
3¡¢
Bakelite material-double group bakelite primer Proportion-primer: cruing agent: special thinner=8£º1£º5 Drying temperature and drying time: 80¡æ, 20 minute.
Bakelite material-elastic coatings. Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 100¡æ, 60-70 minute.
4¡¢
PP material-single group PP special primer Proportion-PP primer: special thinner=1: 0.6-0.8 Drying temperature and drying time: under normal temperature 60¡æ, 20 minute; above normal temperature, no need of stoving
PP material-elastic coatings: Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 60-70¡æ, 90 minute.
5¡¢
Soft plastic rubber material- quick drying rubber primer, leave it for 20 minute after working at normal temperature. Drying temperature and drying time: 60¡æ, 20 minute.
Soft plastic rubber coatings: Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 65¡æ, 60-70 minute.
6¡¢
Unsaturated resins, polycarbonate, POM and other special substrates. Using 2-component, high strength primer, 3£º1-5£º1,all kinds of colors available. The drying temperature is decided by the thermostability of base materials.
Elastic coatings- Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 65¡æ, 60-70 minute.
7¡¢
Ceramic products-1-component 575 stoving primer Drying temperature and drying time: 100¡æ, 60 minute.
Special ceramic elastic coatings- Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 100¡æ, 60 minute.
8¡¢
Black metal, aluminium, copper, stainless steel and nonferrous metalelastic coatings,combined with 1-component 575 stoving primer; Drying temperature and drying time: 100¡æ, 60 minute.
Nonferrous elastic coatings- Proportion-elastic coatings: cruing agent: thinner=10£º1£º3 or 10£º1 Drying temperature and drying time: 100¡æ, 60 minute.
Note: It is not suitable to do rework. Suggesting that the painting department should improve the qualification rate of painting to reduce the cost of company. In case that need rework, we can provide the special primer for rework.